Base Metals Project
Company:
Darnley Bay Resources Limited
Commodities:
Percent ownership:
100
Dev stage:
Prospecting
Gps coordinates:
Description:
DBR's 2007 Base Metals Project objective is to intersect, by drilling, the intrusive source and associated metals believed to underlie the Anomaly.
The drill program is to include:
NQ (47.6 mm diameter) coring to intersect the source of the Anomaly.
The drilling program will include a series of wedged holes from each master hole to probe any nearby electromagnetic anomalies as detected by down hole geophysical responses. Drilling should verify composition and the spatial position of the Anomaly and into the anticipated associated metallic deposits.
The information from prior magnetic, gravity and electromagnetic surveys will indicate where best to locate the master drill holes. The number of ultimate drill holes, and their depth, cannot be determined until the early results of master holes become available.
On intersecting the intrusive source, an electromagnetic survey will be carried out with a down hole probe designed to detect massive sulphide conductors within a 300 metre radius of the hole. The probe operates to a depth of about 3km. All sensor signals are digitized and transmitted to the surface.
HQ (63.5 mm diameter) coring for testing the two vertical conductors within the Thrasher Zone to reveal the possibly associated metallics.
Country:
Canada